At the end of June, the E25-E40/A602 link (Cointe tunnel) underwent four additional night closings intended to carry out tests and adjustments to speed regulation devices. However, it appears that these interventions were not sufficient, indicates the SOFICO at the DH. As a result, other closing nights are envisaged in the coming days-from July 7-with the objective, hoped for by SOFICO, to be able to restore a maximum speed of 80 km/h in a lasting way in mid-July.
“The next closing nights that will take place will allow to perform new tests and adjustments related to speed modulation equipment, aVec the expected objective of providing the conditions necessary to activate the speed modulation equipment. Recall that the decision to raise speed in the connection is a prerogative of the Walloon Minister in charge of mobility and infrastructure ”Sofico said.
As a reminder, the speed in this motorway junction is limited to 50km/h from the damage of the floods of July 2021.
Previous: queues of more than 2 hours and some discomfort in startup the Les Ardentes festival
► An error or an article proposal, contact us.