Similarly,
Oïkos construction withdraws imposing project:
One of the important residential projects currently underway in Quebec is at the heart of a conflict between the promoter. Similarly, the general entrepreneur.
By 7 a.m.. Meanwhile, Thursday, the teams of Oikos Construction will withdraw from the vast project at the corner of boulevard Laurier and avenue Germain-des-Prés, announces the company led by Pierre-Yves Charest by press release.
Visibly irritated. Meanwhile, the general entrepreneur points to a “serious conflict situation” which opposes it to the promoter of this project of 169 units, Acero.
“This serious impasse forces us to take important measures. Additionally, Meanwhile, […] This decision. Therefore, although difficult, will remain in force as long as no satisfactory solution has been found in this significant dispute, ”says the president and founder of Oïkos.
The latter formulates several allegations. Nevertheless, oïkos construction withdraws imposing project including payment defects, missing documents and deficient communication which would be at the origin of the delays accumulated on the site. The entrepreneur attributes responsibility to the promoter, stressing that he respected the terms of his contract.
A Business RUP – Oïkos construction withdraws imposing project
At the end of the day. the promoter Acero for his part confirmed the breakdown of the business link between the two companies. He ended his agreement with Oikos Construction on Wednesday.
“Although this decision comes before the end of the work. it will have no negative impact on the continuation and delivery of the project,” says the promoter in his replica.
In the process, Acero wishes to correct the facts. “It is important to specify that it is not in any case a financial issue. that the project does not accuse any defect in payment,” says the company led by oïkos construction withdraws imposing project Benoît Raymond.
While the tower units can be reserved, Acero wants to be reassuring. Hochelaga Construction. the promoter’s construction subsidiary, will take over in the complete management and the continuation of the work on the site.
Delivery of condos is scheduled for 2026, it is specified.
Further reading: Weston, the Belgian company which has nothing against Donald Trump: “This crisis can create opportunities for us” – Private Equity: perception and reality – More than 67,000 deodorants recalled in the United States – United: Strategic turn in the face of the crisis – A Quebecer opens a cane of cat food and it is teeming so much life that his video becomes viral.