Meanwhile,
Meyrin: rubix, modular platform service new:
Meyrin: rubix, modular platform service: This article explores the topic in depth.
Similarly,
Meyrin: rubix. In addition. In addition, modular platform service:
ThoseIndustrial zone in Meyrin –
Rubix, a platform integrated into the service of companies from 2026 – Meyrin: rubix, modular platform service
Designed for the light industry, this technological park combines storage, logistics and offices. Meanwhile, It aims at the luxury, watchmaking, medical and tech sectors.
The two. Similarly, buildings of the Rubix technological park on the Zimeysa de Meyrin-Satigny took shape. Similarly, The structural work of this innovative project was finalized in nine months.
Bringing together in the same storage. Meanwhile. Similarly, logistics building, industrial workshops and offices, it is the winning formula of the meyrin: rubix, modular platform service industrial park project piloted by Real Estate Investment Strategies (REIS) in the Meyrin-Satigny industrial zone (Zimeysa). Consequently, The Rubix projectin reference to the mixtures of colorful surfaces of the Rubik’s Cube. Nevertheless, includes two buildings totaling meyrin: rubix, modular platform service new more than 47,000 m² of modular surfaces for rent.
Already. Meanwhile. For example, already, Unity Machiningex-Georg Fischer Machining Solutions Sales Switzerland SA, rented 8,300 m², a third of the modular surfaces of one of the buildings, in order to bring together its production of precision machine tools and laser technologies, storage, logistics and administrative offices.
“We are in talks with other companies. Meanwhile, We offer them loading quays and storage spaces up to 6.90 m in ceiling. Furthermore, carrying slabs on the ground floor which can support 1500 kg per m² and highlights with a capacity of 6 tonnes. Consequently, All for meyrin: rubix, modular platform service 200 to 250 francs per m². This is quite unique, ”says Anne-Pascale Marchand, in charge of marketing Rubix. Luxury companies, watchmaking, medical or high -tech companies are targeted.
Delivery of the industrial park in 2026
In nine months. after launching the foundation stone in September 2024. the structural work was finalized last June by some 120 workers from different trades of the Her company and marked by the celebration of this site bouquet which sank 29,000 m³ of concrete and employee 3,8860 tonnes of metal reinforcements. Second work work will therefore be able to start for delivery in 2026.
“Rubix is one of our biggest projects currently, with our achievements as a watch manufacturer, hotel and diplomatic mission. We had already designed buildings dedicated to logistics. storage such as the Emma-Kammacher hall in Meyrin. ”says meyrin: rubix, modular platform service Corentin Renaud, architect and member of the Management Board cabinet dGPa.
“With Rubix. we pushed the experience a meyrin: rubix, modular platform service new little further with a project that brings together on the ground floor storage-logistics areas and. in the floors, industrial business workshops and other offices related to industrial assignments.”
The architects of the DGPA firm wanted to highlight the vocation of meyrin: rubix. modular platform service the different spaces with three screens for the office zones. a linear and darker base of industrial zones.
“From an architectural point of view, we have worked on the readability of the spaces of the two meyrin: rubix, modular platform service new buildings. On the front, three glass screens overlook the rue du Pré-Bouvier. This comb arrangement. with these three segments linked in part. has a perpendicular base which is reinforced by the materiality of the facade: ventilated metallic, with a clear tone, resting on a more linear and darker base thus signaling the different industrial spaces of the two buildings “, details the architect.
Think upstream a retraining of the industrial park into housing
But what is very new is the fact that the architects have imagined upstream a possible retraining of the place. “Our office has made a reflection meyrin: rubix. modular platform service on the future of this place in order to accommodate. over the long term, housing in this building which aims to be durable. This structural constraint was established by anticipating at a lower cost a possible conversion meyrin: rubix, modular platform service new of spaces for housing on. a territory in densification. ”
One hundred. twenty workers. masons, chests, crane operators, scrap dealers, site managers and works conductors celebrated meyrin: rubix, modular platform service the Rubix site bouquet, piloted by Reis.
The Rubix site. which will benefit from a wooded place. shops and a restaurant on the ground floor, is easily accessible by public transport as in the car, via the future Montfleury road bar, or by bike by green.
“Latest news”
Do you want to stay at the top of the info? “Tribune de Genève” offers you two meetings per day, directly in your e-mailbox. To not miss anything of what is happening in your canton, Switzerland or in the world.
Other newsletters
Did you find an error? Please report it to us.
Further reading: Cristiana Girelli, a strong head “proud of what is happening in Switzerland” – Châtel-Saint-Denis: a police officer overthrown by a motorist – The closed plain beach meyrin: rubix, modular platform service new – DIRECT. Euro 2025: Swiss supporters invaded Bernne – Athletics: Jason Joseph equals his Swiss record at the Spitzen Leichtathletik.
Further reading: Lausanne: a climate activist dismissed a second time – Carte blanche: “Far West, these municipalities on the border” – Acetamipride, the subject of controversy in France, remains for the time being authorized in Switzerland – RTS.CH – Risk hikers, domestic violence, transport inpaléo – Les Échos de Vacarme – Swiss chocolate: a soft -amer myth – RTS.CH.